CALCULATION OF RAIL TRANSPORTATION FALL DUE
The period of goods is calculated from the next day when the carrier carry the goods, and following this rules:
(1)The period of deliver goods: is 1day.
(2)The period of transport goods: the carload goods by express delivery, less or500 freight per kilometre is 1day
(3)The period of special operation:
If the goos need add ice, once add ice, plus 1day
If the LCL is more than 250 freight pre kilometre, and the 1 do 5 tons container, plus 2 days. More than 10000 kilometre, plus 3 days.
The LCL cargo or dangerous LCL cargo of weight more than 2 tons, the volume more than 3 cubic meters or length more than 9 meters, plus 2 days.
(4)Carload with separate unloading, adding a unloading station, plus 1day.
(5)The through transportation carload goods between standard-gage and meter-gage,plus 1 day.
The less days of cargo transport is 3 days.