中  文 | ENGLISH
a
    SEAFREIGHT

THE TYPE OF SURCHARGE

    By the reason of ship cargo port and other factors, the shipowner increase the cost or take the economy damage in the transportation, and the shipowner to compensate the cost or damage, except for the general rate, the shipowner extra charge for surcharge or additional. Including:

  1、Bunker Surcharge or Bunker Adjustment Factor, BAF

  2、Devaluation Surcharge or Currency Adjustment Factor, CAF

  3、Deviation Surcharge

  4、Suez Canal Surcharge

  5、Transhipment Surcharge

  6、Direct Additional

  7、Port Surcharge

  8、Port Congestion Surcharge

  9、Heavy-Lift Additional

  10、Long Length Additional

  11、Cleaning Charge

  12、Fumigation Charge

  13、Ice Surcharge

  14、Optional Fees or Optional Additional

      15、Alteration Charge

Time:2010/8/13  Number of visits:2209 

 

 
  Tracking
  Please enter the Tracking No.:
 
 
CopyRight© 2007-2010 All Right Reserved  SINOLOGIS GROUP CORPORATION